Assembly of complete gas-cleaning installation consisting of 3 electro-filters, bag filter, drains and other devices in iron-ore mine in Gällivare, Sweden |
|
Construction and assembly of boiler supporting structure and assembly of the boiler in the waste incineration plant in Heimdal near Trondheim, Norway |
|
Execution of a boiler in the waste incineration plant RABA ERFURT in Erfurt, Germany |
|
Execution of waste-heat boiler at the paper-mill Kappa Kraftliner AB Piteå, Sweden |
|
Manufacturing and assembly of the boiler supporting structure and assembly of 2 boilers at the waste incinerating plant MVA in Lausanne, Switzerland |
|
Delivery and assembly of fume dedusting system for two arc furnaces at steel factory BES in Brandenburg, Germany |
|
Construction of a boiler at Paper Stora Enso Borlänge in Sweden |
|
Assembly of three electro-filters at Cellulose Plant in Stendal, Germany |
|
Assembly of the bath-furnace at Glass-works in Jaroslaw, Poland |
|
Manufacturing and assembly of fumes and air drains at Power Plant Kozienice, Poland |
|