|
2010-07-27 |
|
On July 23rd, 2010 took place the positive
hydrostatic pressure test of the boiler in the incineration plant EGE
Oslo in Norway. The contract includes the boiler’s pressure part
assembly (about 1050 tonnes). Our company is going to perform the
assembly of the grate, scrubber and the channels sections, the assembly
of ash transfer system under the boiler and electrofilter, the assembly
of chemicals tanks and oil-gas installation for fire burners.
|
|
weiter …
|